Full Product Description

Self-Climbing Hydraulic Formwork

The Self-Climbing Hydraulic Formwork Model QPMX50 is able to climb automatically. The elevation of the structure and operating platform can be done without the use of other equipment to lift it. It is an ideal choice for construction of high rise buildings and bridges.
The Self-Climbing Hydraulic Formwork Model QPMX50 is able to climb automatically. The elevation of the structure and operating platform can be done without the use of other equipment to lift it. It is an ideal choice for construction of high rise buildings and bridges. The lifting power of the Self-Climbing Hydraulic Formwork comes from the hydraulic elevator system which includes a hydraulic oil cylinder and a commutator. The commutator is able to control the elevation of the climbing rail or structure. It is able to allow the formwork structure and climbing rail to form an inter-climbing through the hydraulic system. As such, this will enable the Climbing Hydraulic Formwork is able to climb at a stable pace. It is easy to operate, able to climb fast and has high safety level.

Features

1.  It is able to climb vertically or inclined and has fast climbing speed.
2.  It is able to climb as a whole or separate unit. The climbing process is stable, consistent and safe.
3.  After assembling this system formwork once; it is able to climb up to the top without any intermittent fall and this saves space at the worksite. This also lowers the chances of damaging the formwork, especially on its surface. At the same time, this improves productivity, as it is able to increase crane operational efficiency. The self-climbing on the structure is fast and as such, this will speed up the workflow process.
4.  The self-climbing hydraulic is equipped with an operating platform. As such, workers are not required to do the set-up and this help to save on manpower and materials.
5.  There is low error rate in the construction of the structure. Errors can be easily rectified at each level.
6.  The formwork is able to climb automatically and to be cleaned onsite. As such, this will significantly increase crane operational efficiency.

Climbing Process Flow

1.  Erect formwork, use cone suspension and lateral bracing to secure the formwork. Commence the first round of concrete pouring.
2.  Dismantle the formwork and install the Anchor shoe. Lift the bracket and formwork, install the middle platform, position the formwork correctly and commence on the second round of concrete pouring.
3.  Raise the formwork and brackets to a higher level, attached the guard rail, hydraulic system and suspended platform.
4.  Close formwork and commence on the third round of concrete pouring.
5.  Dismantle the formwork and shift it backwards, attached it on the wall and climb rail.
6.  The Brackets reached its designated position.
7.  Close formwork, commence on the concrete pouring, and the standard climbing process commences.